A is a tool used in quality management.
选项:
A:
probability matrix
B:
checklist
C:
request for proposal
D:
critical path analysis
probability matrix
checklist
request for proposal
critical path analysis
以下文字与答案无关
提示:有些试题内容 显示不完整,文字错误 或者 答案显示错误等问题,这是由于我们在扫描录入过程中 机器识别错误导致,人工逐条矫正总有遗漏,所以恳请 广大网友理解。
Dial indicator.
B:Shaft gauge,
C:Protractor.
Engineering Process Group
B:Project Manager
C:Quality Assurance Group
D:Senior Management
Data flow analysis and design
B:Business flow analysis and design
C:Flow analysis and design
D:modular
--Last year.
*
选项: A:did; use
B:was; used
C:is; used
D:are; used
possibility
B:probability
C:alternative
D:candidate
detail feasibility analysis
B:opportunity analysis
C:economic feasibility analysis
D:risk analysis
A、"The quality of the goods delivered should be the same as the quality of the sample."
B:B、"The quality of the goods delivered should be equal to the quality of the sample."
C:C、"The quality of the goods delivered should be about equal to the quality of the sample."
D:D、"The quality of the goods delivered should refer to the quality of the sample."
quality objective
B:quality policy
C:quality control
D:quality system
Their taste has changed when they are away.
B:They have got used to the foreign culture
C:They have become more critical than before
D:New problems have developed in their country
potential
B:possibility
C:probability
D:productivity
is used
B:are used
C:are using
D:have used
potential
B:ability
C:practice
D:probability
to
B:with
C:has
D:and
truth
B:definite
C:quality
D:retire
Tool
B:Automation
C:Device
D:FAX
use to
B:used to
C:be used to
menu
B:tool
C:program
D:run
tend
B:tends
C:path
D:pride
Hosting a radio program.
B:Giving a lecture on management.
C:Doing a presentation in a company.
D:Attending a meeting on project development.